Retail Projects
“A solid team with a common goal and focused leadership will always achieve the highest levels of excellence.”
-
Ventor Plaza Facade Renovation
Looking to update and bring a new life to their shopping center exterior façade, Ventnor Loan, LLC, procured KAVI Construction’s services to completely renovate the exterior façade of a shopping center in Ventnor, New Jersey. The scope of the work consisted of constructing the new façade face with metal studs, sheathing, and new stucco finish. Also completed was a new cornice detail to bring a more updated look to the plaza.
Date Completed: January 2014
Square Footage: N/ A
Construction Cost: $640,000.00
-
MBM Sporting Goods
Washington Center 8,000 sf retail fit-out.
Date Completed: August 2009
Square Footage: 2,800
Construction Cost: $112,523.51
-
Oaks Integrated Care
Expanding their services to include pharmaceutical needs to the clientele, Oaks Integrated, contracted with Kavi Construction to renovate (3) spaces in a multiphase project. The 1st phase consisted of renovating an existing storage which would become their new permanent conference room. The old conference room was then renovated so their existing thrift shop and pantry could be relocated seamlessly. And the 3rd phase was the construction of the new pharmacy which includes new lighting, ceiling, finishes, flooring, and custom millwork. This phase also included new security roll down/up gate and window grilles.
Date Completed: May 2016
Square Footage: 1,600
Construction Cost: $110,000.00
Photos Coming Soon
-
Earthwise Pet Supply, Voorhees
Looking to turn their love of animals into a lucrative business, a private entrepreneur couple enlisted help from KAVI Construction for preconstruction services from budgeting, space planning, and visiting several potential locations of viability. Once a final plan and location were established, KAVI Construction was able to deliver design documents for permitting and construction. The project was delivered on time and within budget to get the client up and running as quickly and efficiently as possible. The scope of work consisted of HVAC ductwork, new wall partition construction, new finishes and grooming equipment installation.
Date Completed: October 2016
Square Footage: 1,800
Construction Cost: $148,000.00